Material has started to arrive which will allow work to begin forming the rear fuselage frames. The material required for sheetmetal work on the tailplane and flaps was also brought in to allow continued progress when delays are met with the fuselage construction. Flap rib tooling is currently being designed, with rib construction expected to begin in short order. Stay tuned!